Blog post 6

This week we have made advances on our second second to final blue print, great innovations on our physical machine and are inching closer to a finished movie. This week was filled with productivity, problems and solutions, building, drawing and all round positivity and progress.

         The engineers, Michael and Zak are the two designated builders and innovators for this project, they have been putting in good effort and ideas and they have created a good solid wooden base and nice wood ramps this week. Gabi and I are the architects, this week we have been drawing out a 1:1 scale blue print of our machine, we have been doing measurements that are what the engineers will (hopefully) use in the final product. Gabi and I have been creating the blue print in inches which we have realized we have to convert to centimetres, just another obstacle for us to over come. Chris and Anatolia have been filing and editing, there’re jobs as story tellers are to create a movie that documents the journey that is out project. I believe that they are doing a great job and the movie will be awesome.

  In conclusion we have had another great weak, we have made good progress and rarely slacked off. Each member of the dream team is working at full speed and in harmony with each other. We have nothing really to improve on other then staying positive and productive.

Leave a Reply

Your email address will not be published. Required fields are marked *